List of New Construction Projects

Requests for Public Comment

Requests for a public comment period on a permit application must be submitted within 15 days of its posting.

Submit a written request to the Clean Air Agency via:

  • Email: Refer to contact on the permit application
  • Fax: 206-343-7522
  • Postal Mail

New Construction Projects

Company Address                      
Project Description
Date Posted
Contact Engineer
Evergreen Sign Company 1513 Central Ave S, Kent, WA  98032 Installation of one spray booth for spray coating operations. 1/16/18 Madeline Camp
Shell Distribution Terminal 2555 13th Ave SW, Seattle, WA  98134 Installation of one new above-ground contact water tank and conversion of one storage tank from diesel to gasoline. 1/16/18 Sara Conley
Svin Garden LLC 30320 Old 99 N Unit A, Stanwood, WA  98292 Marijuana production and processing. Including propane/butane extraction. 1/4/18 Brian Renninger
Terex Washington Inc 18700 NE 65th St, Redmond, WA  98052 Installation of a burn off oven for the removal of dried paint from metal parts. Replacement of an abrasive blasting booth with a new blast enclosure. 1/4/18 Brian Renninger
Terrene Inc 4212 Russell Rd, Suite M, Mukilteo, WA 98275 The applicant is proposing to install a laser for cutting of metal, plastics and wood. Emissions would be controlled by an existing filter and adsorber. 1/4/18 Maggie Corbin