List of New Construction Projects

Requests for Public Comment

Requests for a public comment period on a permit application must be submitted within 15 days of its posting.

Submit a written request to the Clean Air Agency via:

  • Email: Refer to contact on the permit application
  • Fax: 206-343-7522
  • Postal Mail

New Construction Projects

Company Address                      
Project Description
Date Posted
Contact Engineer
US Oil & Refining Co 3001 Marshall Ave, Tacoma, WA  98421 Application submitted to add a carbon canister control device to the Jet clay treater vessel to meet the 40 CFR 63 Subpart CC maintenance vent provisions. 11/15/17 Ralph Munoz
Starbucks Coffee Co 18411 77th Pl S, Kent, WA  98032 Starbucks proposes to install two new roasters with emissions controlled by two catalyst beds and two thermal oxidizers. 11/15/17 Sara Conley
AIM Aerospace 1516 Fryar Ave, Sumner, WA  98390 Dust Control Booth for use in aerospace composite manufacture. 11/15/17 Brian Renninger
US Navy Puget Sound Naval Shipyard PSNS 1400 Farragut Ave, Bremerton, WA 98314 Proposal to replace 3 dust collectors and add 1 dust collector at the Thermal Cutting Process Center. 11/1/17 Alfredo Arroyo
Rodrigo Manuel Ocampo 1123 S 351st St, Ste B, Federal Way, WA 98003 Proposal to establish a new cannabis growing and processing facility. 11/1/17 Alfredo Arroyo
Twenty Plus 1631 E Portland Ave, Tacoma, WA 98421 Proposal to establish a new cannabis growing and processing facility. 11/1/17 Alfredo Arroyo
Pinnacle Productions 12001 Aurora Ave, Ste B, Seattle, WA  98133  Proposal to replace two box kilns for the calcination of ceramics and metal oxides.  11/1/17 Alfredo Arroyo
Praxair Specialty Ceramics 16130 Woodinville-Redmond Rd, #7, Woodinville, WA 98072 Proposal to replace two box kilns for the calcination of ceramics and metal oxides.  11/1/17 Alfredo Arroyo
Boeing Developmental Center 9725 E Marginal Way S, Tukwila, WA  98108 Proposal to install a new Cleaver-Brooks boiler rated at 36 MMBtu. Boiler will use natural gas as primary fuel and diesel as back up fuel. 11/1/17 Alfredo Arroyo
Sustainable Organic Solutions LLC 2700 4th Ave S, Ste E2,Seattle, WA  98134 New application submitted for a marijuana production and processing facility. 10/31/17 Brian Renninger
Downtown Cannabis Company, LLC 612 S Alaska St, Seattle WA  98108 Tier II Indoor marijuana production and processing facility with carbon canisters to control odors 10/31/17 Sara Conley
Cultivar Farms LLC 3300 6th Ave S, Seattle, WA  98134 Cultivar Farms has applied for a permit to produce marijuana in an indoor facility containing approximately 17,500 square feet of plants. 10/31/17 Maggie Corbin
Lehigh Northwest Cement Company Pier 3, 2730 Terminal Avenue, Everett, WA  98201 Modification to ship unloading equipment to allow unloading of cement from barges including replacement of a dust collector. 10/31/17 Brian Renninger