List of New Construction Projects

Requests for Public Comment

Requests for a public comment period on a permit application must be submitted within 15 days of its posting.

Submit a written request to the Clean Air Agency via:

  • Email: Refer to contact on the permit application
  • Fax: 206-343-7522
  • Postal Mail

New Construction Projects

Company Address                      
Project Description
Date Posted
Contact Engineer
Safety-Kleen Inc Dba Emerald Services Inc 1825 Alexander Ave, Tacoma, WA  98421 Substantial alteration to the emission control technology installed on the existing oil re-refinery. Alteration includes installing a new sulfur dioxide scrubber system downstream of the existing thermal oxidizer.  3/26/19 Alfredo Arroyo
Cedar Grove Composting, Inc 3620 36th Pl NE, Everett, WA  98201 Revisions to Conditions 11 and 14 to the existing Order of Approval 10455 per the Settlement agreement on NOV 3-009437. 3/26/19 Alfredo Arroyo
Terrene Inc 4212 Russell Rd, Suite M, Mukilteo, WA  98275 The applicant is proposing to replace an existing laser system. The system is used to cut wood, metal and plastics.  3/21/19 Maggie Corbin
Washington Military Department - CSMS 9705 McCall Rd, JBLM, WA  98433 Applicant is requesting approval to operate a paint stripping booth that will be used to remove paint and paint products from military vehicles and equipment in preparation for resurfacing and painting. 3/21/19 Maggie Corbin
Lighthouse Roasters, Inc. 400 N 43rd St, Seattle, WA  98103 Application for 48.5 lb/batch coffee roaster burning natural gas at an existing roasting facility. The emissions from the roaster are treated with an afterburner burning natural gas. 3/19/19 Madeline Camp
Gardner-Fields Inc 2240 Taylor Wy, Tacoma, WA  98421 New permit application submitted to adjust current permit monitoring language for the thermal oxidizer, as well as route the current asphalt tanks demisters to the existing thermal oxidizers to help reduce odors. 3/13/19 Ralph Munoz
Lenz Enterprises Inc 5210 SR 532, Stanwood, WA  98292 Application for the expansion of an existing composting facility to increase feedstock capacity from 75,000 to 150,000 tons per year. 3/13/19 Courtney O'Gorman
Costco Wholesale #1 4401 4th Ave So, Seattle, WA  98134 Application to increase maximum throughput at existing gas station. 3/8/19 Madeline Camp
Commencement Bay Corrugated 13413 142nd Ave E, Orting, WA  98360 Application to modify permit condition for testing of a natural gas fired boiler at a corrugating facility. 3/8/19 Madeline Camp
Manke Lumber Co Inc 13702 Stewart Rd, Sumner, WA 98390 New application submitted to install baghouse on the existing wood working operation. 3/7/19 Ralph Munoz
Capital Industries Inc 5801 3rd Ave S, Seattle, WA  98108 Application to install a laser cutter controlled by a dust collector at a metals fabricating facility. 3/7/19 Madeline Camp
Capital Industries Inc 5801 3rd Ave S, Seattle, WA  98108 Application for fiber optic laser cutting controlled by a cartridge dust collector at a metal product manufacturing facility. 3/7/19 Madeline Camp
Rainier Veneer Inc 8220 Eustis Hunt Rd, Spanaway, WA  98387 New permit application submitted to increase current production limits in existing Order of Approval.   3/7/19 Ralph Munoz
Marine Vacuum Services 1516 S Graham St, Seattle, WA 98108 Establishment of a facility with the following operations: receiving of septage, treatment of centralized wastewater and oil recovery from wastewater. Equipment includes an oil dryer, diesel-fired boiler, storage/holding tanks and treatment tanks. 3/6/19 Alfredo Arroyo
Emerald Recycling Inc. 1500 Airport Wy S, Seattle, WA  98134 Substantial alteration of the emissions control technology installed on the existing industrial wastewater pre-treatment system. Alteration includes adding a carbon adsorption system to the existing chemical oxidation system. 3/6/19 Alfredo Arroyo