- Home
- Permits & Registration
- List of New Construction Projects
List of New Construction Projects
Requests for Public Comment
Requests for a public comment period on a permit application must be submitted within 15 days of its posting.
Submit a written request to the Clean Air Agency via:
- Email: Refer to contact on the permit application
- Fax: 206-343-7522
- Postal Mail
New Construction Projects
Company | Address | Project Description | Date Posted | Contact Engineer |
---|---|---|---|---|
Cascade Recycling Center | 14020 NE 190th St, Woodinville, WA 98072-8470 | An air filtration system designed to enhance indoor air quality that is connected to an optical sorting
system which segregates commodities from recyclable materials.
|
5/15/23 | Carl Slimp |
Starbucks Manufacturing Corporation | 18411 77th Pl S, Kent, WA 98032 | Application to modify the averaging time of the minimum temperature for a catalyst bed on an existing coffee roaster. | 5/15/23 | Madeline McFerran |
Edmonds, City of, Wastewater Treatment Plant | 200 2nd Ave S, Edmonds, WA 98020 | New permit application submitted to adjust the temperature range permit condition for the biotrickling filter system. | 5/11/23 | Ralph Munoz |
Bonney-Watson Washington Memorial Park | 16445 International Blvd, SeaTac, WA 98188 | Replacement of a Crematory unit with an American Crematory Equipment Co, Model A-250-Instant Access. | 5/10/23 | Carl Slimp |
Boeing Commercial Airplane Auburn | 700 15th St SW, Auburn, WA 98002 | New application submitted for a laser cutting machine. | 5/10/23 | Ralph Munoz |
Glacier Northwest Inc Taylor Way | 3601 Taylor Wy, Tacoma, WA 98421 | New application submitted to add two new baghouses to the current configuration | 5/10/23 | Ralph Munoz |
Tacoma Rail | 2601 SR509 North Frontage Road, Tacoma, WA 98421 | Application for installing and operating a sand storage and dispensing system for train traction at an existing locomotive service facility. | 5/1/23 | Madeline McFerran |