List of New Construction Projects
Requests for Public Comment
Requests for a public comment period on a permit application must be submitted within 15 days of its posting.
Submit a written request to the Clean Air Agency via:
- Email: Refer to contact on the permit application
- Fax: 206-343-7522
- Postal Mail
New Construction Projects
Company | Address |
Project Description |
Date Posted |
Contact Engineer |
---|---|---|---|---|
Clearwater Spas | 20015 67th Avenue NE, Arlington, WA 98223 | Application for the establishment of a hot tub and bath manufacturing facility consisting of two spray booths for manufacturing spas and tubs using spray foam and sprayed plastic. | 3/8/21 | Madeline McFerran |
Tacoma Public Works | 3210 Center St, Tacoma, WA 98409 | Replacement of existing asphalt plant baghouse and drum dryer/burner. | 3/1/21 | Brian Renninger |
Rapid Readymix Co | 4620 172nd St NE, Arlington, WA 98223 | Installation of one portable concrete batch plant and auxiliary silo. | 3/1/21 | Brian Renninger |
Cobalt Enterprises | 17301 51st Ave NE, Arlington, WA 98223 | Relocation of an existing aerospace spray booth from Lake Stevens to Arlington. | 3/1/21 | Brian Renninger |
Snohomish Co Community Transit | 7000 Hardeson Rd, Everett, WA 98203 | Application for two paint booths for spray coating of transit vehicles at an existing transit maintenance facility. | 2/23/21 | Madeline McFerran |
Lafarge PNW | 5400 W Marginal Way SW, Seattle, WA 98106-1599 | The applicant has requested to modify existing permit conditions to remove a 12 hour per day limit on its existing slag dryer. | 2/22/21 | Maggie Corbin |