List of New Construction Projects

Requests for Public Comment

Requests for a public comment period on a permit application must be submitted within 15 days of its posting.

Submit a written request to the Clean Air Agency via:

  • Email: Refer to contact on the permit application
  • Fax: 206-343-7522
  • Postal Mail

New Construction Projects

Company Address Project Description Date Posted Contact Engineer
Group14 Technologies, LLC  8502 Maltby Rd, Woodinville, WA 98072  The applicant is requesting a modification to an existing emission limit on the exhaust from an air emission control device installed to control air emissions from an existing process at the facility. 1/17/23 Maggie Corbin 
Franz Seattle Division - 6th Ave.  2901 6th Ave S, Seattle, WA 98134  Request to modify the air emissions testing method used to test the existing recuperative catalytic oxidizer controlling the bun oven at a commercial bakery. 1/12/23 Madeline McFerran