List of New Construction Projects

Requests for Public Comment

Requests for a public comment period on a permit application must be submitted within 15 days of its posting.

Submit a written request to the Clean Air Agency via:

  • Email: Refer to contact on the permit application
  • Fax: 206-343-7522
  • Postal Mail

New Construction Projects

Company Address                      
Project Description
Date Posted
Contact Engineer
Clearwater Spas  20015 67th Avenue NE, Arlington, WA 98223  Application for the establishment of a hot tub and bath manufacturing facility consisting of two spray booths for manufacturing spas and tubs using spray foam and sprayed plastic. 3/8/21 Madeline McFerran 
Tacoma Public Works  3210 Center St, Tacoma, WA 98409  Replacement of existing asphalt plant baghouse and drum dryer/burner. 3/1/21 Brian Renninger 
Rapid Readymix Co  4620 172nd St NE,  Arlington, WA 98223  Installation of one portable concrete batch plant and auxiliary silo.  3/1/21 Brian Renninger
Cobalt Enterprises  17301 51st Ave NE, Arlington, WA 98223  Relocation of an existing aerospace spray booth from Lake Stevens to Arlington. 3/1/21 Brian Renninger
Snohomish Co Community Transit  7000 Hardeson Rd,  Everett, WA 98203  Application for two paint booths for spray coating of transit vehicles at an existing transit maintenance facility.  2/23/21 Madeline McFerran 
Lafarge PNW  5400 W Marginal Way SW,  Seattle, WA 98106-1599  The applicant has requested to modify existing permit conditions to remove a 12 hour per day limit on its existing slag dryer. 2/22/21 Maggie Corbin